Custom service

Signage automation, configured for your shop

The free tools show the idea with generic inputs. A custom build uses your price list, your proposal wording, your survey checklist and your approval rules, so your team quotes and reports the same way every time.

What you get

Each project is scoped to the steps you choose. Typical pieces of work:

  • Quote calculator

    What it does
    Prices wraps, window graphics, panels, letters or installs using your rules, minimums and margin targets; flags quotes that need approval.
    Built from
    Your price list and labour rates
  • Proposal builder

    What it does
    Assembles proposals from approved scope, exclusion and terms blocks; outputs Word or PDF in your branding.
    Built from
    Your current proposals and clauses
  • Survey form and report

    What it does
    Captures site measurements, access, power and photos in a structured form and drafts the survey report with missing items listed.
    Built from
    Your survey checklist
  • Maintenance reporting

    What it does
    Records inspections across a customer's sign estate and produces the periodic report and action list.
    Built from
    Your inspection routine
  • Hand-offs

    What it does
    Sends accepted quotes to your job sheet or job-management tool and invoice details to your accounts package, where those systems allow it.
    Built from
    Your existing systems

Systems we work with

We start with what every shop has: spreadsheets (Excel or Google Sheets), Word or Google Docs templates, PDF output and email. Connecting to a job-management, CRM or accounting system depends on whether it offers an API or import/export that we can use with your account. We check that during scoping and tell you plainly if it is not possible. We do not list named integrations here because none has been delivered and verified for a signage customer yet.

Who is responsible for what

We are responsible for

  • The workflow doing what the agreed specification says
  • Calculations matching your rules, with tests using your own past jobs
  • Documentation your team can follow
  • Fixing defects found during the parallel-run period

You remain responsible for

  • Your prices, margins and terms
  • Approving quotes, proposals and reports before they reach customers
  • Technical decisions: structural, electrical, planning, permit and accessibility requirements
  • Access to the systems and sample documents we need

How a project runs

  1. Scoping conversation. You show us how a quote, proposal or report gets made today, where it slows down and what goes wrong.
  2. Sample jobs and written scope. You share a handful of past jobs with the real figures. We write down what will be automated, what stays manual, and how we will test it.
  3. Build against your figures. We configure the workflow and check that it reproduces your past quotes and documents.
  4. Parallel run. Your team uses it alongside the old way on live jobs, with every output reviewed, until you are confident in it.
  5. Handover. Documentation, the files and accounts you own, and an agreed way to make changes when your prices or wording change.

Fees are quoted per project after scoping. We have not published standard prices.

What to send us

The most useful first message says which workflow you want to fix (for example "vehicle wrap quotes" or "quarterly maintenance reports"), how you do it today, which software you use, roughly how many a month, and whether you are in the UK or US. Please do not send customer documents in the first message; we will agree how to share samples safely.