Proposal: Oakfield Business Park entrance monument sign
Prepared for: Oakfield Estates Management (example), facilities manager
Prepared by: Example Sign Co
Site: Main entrance, Oakfield Business Park (fictional site)
Date: 26 October 2026 · Valid until 25 November 2026 · Ref MS-2026-007
1. Project summary
Supply and installation of one double-sided, internally illuminated monument sign at the main vehicle entrance, listing the park name and up to six tenant panels.
2. Sign description
| Sign type | Double-sided monument sign |
| Quantity | 1 |
| Overall size (W × H × D) | 2,400 × 1,800 × 400 mm (approx. 94 × 71 × 16 in) |
| Base / plinth | Rendered plinth cladding on a steel frame, 400 mm high, colour to client's choice |
| Sign cabinet or panels | Aluminium cabinet, powder coated, with routed aluminium faces and push-through acrylic park name |
| Graphics and lettering | Park name in push-through acrylic; six replaceable tenant panels with applied vinyl |
| Illumination | Internal LED. Supply and final connection by the client's electrician (section 4). |
3. Drawings and approvals
Two rounds of drawings are included. Fabrication starts only after the client approves the final drawing in writing.
4. Responsibilities
| Item | Included in this proposal | By others |
|---|---|---|
| Sign design drawings for approval | Example Sign Co | |
| Fabrication, finishing and delivery of the sign | Example Sign Co | |
| Installation of the sign onto the completed foundation | Example Sign Co | |
| Foundation design and structural calculations | Client's structural engineer | |
| Foundation construction, including any anchor bolts or cast-in fixings | Client's groundworks contractor | |
| Underground services search before digging (UK) or utility locate, e.g. 811 (US) | Client's groundworks contractor | |
| Power supply to the sign location | Qualified or licensed electrician | |
| Final electrical connection and testing | Qualified or licensed electrician | |
| Planning or advertisement consent (UK), sign permit (US), landlord approval | Oakfield Estates Management (example) | |
| Landscaping, paving and making good around the base | Oakfield Estates Management (example) |
5. Price
| Item | Amount |
|---|---|
| Design and two rounds of drawings | £650.00 |
| Fabrication: aluminium cabinet, routed faces, rendered plinth cladding | £8,400.00 |
| Delivery and installation (two-person team and lifting equipment, 1 day) | £1,450.00 |
| Anchor bolt template and setting-out visit | £280.00 |
| Subtotal | £10,780.00 |
| VAT at 20% | £2,156.00 |
| Total | £12,936.00 |
Prices in pounds sterling, fixed for 30 days. Figures in this example are illustrative, not market prices.
6. Programme
Drawings within 10 working days of order. Fabrication 5 to 6 weeks from drawing approval. Installation within 10 working days of the foundation being complete and cured.
7. Assumptions
- Clear access for a delivery vehicle and a 3.5 t lifting vehicle at the entrance, outside peak hours
- Foundation complete, cured and set out to the engineer's drawing using our anchor bolt template
- Power supply terminated in an isolator at the base before installation day
8. Not included
- Foundation design, structural calculations and any engineer's certification.
- Electrical supply, connection, testing or certification.
- Planning, advertisement consent, sign permits, landlord or highway approvals and their fees.
- Underground services search, utility locate or diversion of services.
- Removal of contaminated ground, rock breaking or work beyond the dig depth on the approved foundation drawing.
- Landscaping, paving and making good.
9. Payment terms
30% on drawing approval, 50% before delivery, balance within 30 days of installation.
10. Acceptance
To accept this proposal, sign below and return it before 25 November 2026.
| Name | |
| Position | |
| Company | |
| Signature | |
| Date |
Completed example of template Version 1.0, 26 October 2026. Synthetic: the client, site and figures are invented.